Abstract:In this paper, the water supply project in Tianshui City has the problem of long lines, many control nodes, and scattered layouts. The traditional management model is very diffificult to control and measure key nodes, and it also consumes a lot of manpower and fifinancial resources. In order to solve the problem, it builds an information network platform covering the whole project, forms a standard and standardized safe operating system, builds corresponding application systems and analysis platforms to provide solutions for scheduling management and project management, and discusses the overall network architecture and topology according to the plan and system composition. The application results from 2019 show that the system accelerates the effificiency of data statistics, analysis and summary through the application of automated reports, improves the accuracy and reliability of data collection and extraction, and improves the management level and quality of the staff in the irrigation area. The accuracy and timeliness of water resources scheduling are also improved.